
ISBN-13: 9781628256192
Trade Paperback
100 Pages
Practice Standard for Work Breakdown Structures - Third Edition
by Institute, Project Management
Availability Unavailable
This book is not currently available for rent or purchase.
Product Details
ISBN-139781628256192
ISBN-101628256192
PublisherProject Management Institute
Published07-2019
Edition3
LanguageEnglish
FormatTrade Paperback
Pages100
About This Book
The Work Breakdown Structure (WBS) serves as a guide for defining work as it relates to a specific project's objectives. This book supplies project managers and team members with direction for the preliminary development and the implementation of the WBS. Consistent with A Guide to the Project Management Body of Knowledge (PMBOK(R) Guide)-Sixth Edition, the WBS Practice Standard presents a standard application of the WBS as a project management tool. Throughout the book, the reader will learn what characteristics constitute a high-quality WBS and discover the substantial benefits of using the WBS in every-day, real-life situations.
